Leppington Building
Inspections

Common building defects in Leppington NSW

The photographs here come from fourteen Leppington inspections, and they are unusually concentrated. Forty eight from frame, which is the largest single stage set on any site in this network. Twenty eight at fixing, twenty two at lock-up, nineteen at handover and eleven at slab. The frame findings are fixings; the handover findings are safety. That shape tells you where to spend: frame for the structure, handover for the things that could hurt somebody.

Guides

Guides for Leppington owners and buyers

All guides →

Book a building inspection in Leppington

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Common building defects in Leppington NSW: common questions

Why is the frame set so large?

Partly because frame inspections generate more discrete items than any other stage, and partly because Leppington frames combine timber with steel posts and beams, which doubles the fixing types to check.

Forced to choose one stage, which?

Frame, on this evidence. It produces the longest list and it carries the structure.

Does a lengthy list mean the builder is bad?

Not by itself. The meaningful reading is the structural to cosmetic split, and whether items reappear after rectification.

CallGet a Free Quote